Lightning Protection for Photovoltaic Systems
PV is among the most strike-prone installations — module frames, rails, backplanes and DC insulation are all failure points; protect with DC-side SPD (with DC fuses) plus signal-side TVS/ESD.
PV systems suffer lightning damage at rates well above comparable buildings. The reason is not mysterious: a PV array is a large-area, elevated, and directly exposed metal structure sitting in the interception zone.
1. Failure morphologies
| Morphology | Typical appearance | Principal cause |
|---|---|---|
| Module burn-out | Scorched frames, shattered glass, burnt backplane | Direct strike, current discharging through module frames or backplane |
| DC arcing | Burnt DC connectors, tracking-type damage | No overvoltage protection on the DC side; strike current heating at terminations |
| Inverter failure | Rupture, insulation faults reported | Direct strike coupling or surge ingress into the DC side |
| Insulation degradation | Low insulation resistance, MPPT faults | Moisture plus carbonisation following DC arcing |
Key observation: the majority of lightning damage in PV systems occurs at connectors and cables, not in the modules themselves. Current takes the path of least impedance, and while the module interior is blocked by semiconductor layers, connector copper is pure metal.
2. Four positions that must be addressed
1. Module frame interception and equipotential bonding
The module frame is exposed metal, and it needs two things:
- Interception: modules projecting beyond the roof's interception zone need their own down-conductor bonded back to the roof air-termination system
- Bonding: all module frames, mounting rails, and roof metalwork connected into an equipotential body
Neither alone is sufficient. Bonding without interception means the strike current still flows through the frames — it simply burns the connectors instead of the modules. Interception without bonding leaves the current to find an uncontrolled path through the array, and that is when you get "only some modules destroyed".
2. DC-side SPDs
This is the most frequently omitted and the most critical element of PV protection.
An AC-side SPD does not protect the DC side, because: - The DC side has no neutral reference, so surges superimpose as common-mode voltage across the array - DC voltage is pulsating (pulsating DC, single-polarity grounding systems), so the operating voltage window is wider than on AC - A direct strike current introduced through the array flows straight into the DC cabling
DC-side SPD requirements differ from AC:
| Item | DC-side requirement |
|---|---|
| Uc | Must cover the maximum open-circuit voltage (Voc), including the low-temperature rise (Voc increases by roughly 5%–10% at low temperature) |
| Poles | Single pole (positive-to-earth, negative-to-earth) or two-pole |
| Current capacity | Must account for how the strike current divides and concentrates within the array |
| Fusing | A DC-specific fuse is mandatory — a DC arc does not self-extinguish |
| Position | Immediately at the inverter DC input (at the combiner) |
Never omit the DC fuse
When a DC-side SPD fails short, the arc does not extinguish at a current zero as on AC; it can sustain until the equipment burns down. A DC-specific fuse (gPV class) providing fast disconnection is essential. On AC this can be substituted with an ordinary fuse; on DC it cannot.
3. Inverter and grid interface
The inverter AC output should have a Type 2 SPD, and it must be within one metre of the inverter AC output.
The inverter carries the densest and most expensive electronics in the system, so protecting it deserves the highest priority. Note also that if the inverter connects to a grid that is itself exposed (overhead distribution), the grid connection point needs protection against induced lightning and grid-side switching surges.
4. Mounting structure and earthing
The connection between the PV mounting rails and the roof (embedded plates or clamps) is routinely underestimated. It is the mandatory path for current from the array to the down-conductor.
- Connections must be reliable (welded or bolted with anti-loosening measures)
- Rail-to-PE conductor cross-section must meet requirements
- Roof waterproofing at penetrations: the down-conductor, SPD cables, and combiner all penetrate the roof. After a strike, it is often the roof that leaks first, not the equipment that fails. Inspect this at commissioning.
3. Why rooftop PV is different
① Elevation increases the probability of being struck. Prominent metal structures are struck more readily. Statistically, rooftop PV is significantly more strike-prone than a flat roof of the same area.
② Current distribution within the array is complex. How current divides between module frames depends on the relative connection impedances. Without equipotential bonding, current concentrates on the lowest-impedance path — a particular frame or rail — and destroys that section locally. This is exactly why "only part of the array is damaged".
Equipotential bonding in PV is therefore not optional, in the way it is in some general building applications.
4. Recommended measures
| Position | Measure |
|---|---|
| Module frames | Dedicated down-conductor where outside the interception zone + equipotential bonding across the array |
| DC side (combiner / inverter input) | DC SPD with DC-specific fuse, immediately at the inverter |
| Inverter AC output | Type 2 SPD within 1 m of the inverter |
| Grid connection | Type 2 SPD where the connection point is on the grid side |
| Roof penetrations | Waterproofing detail at every penetration |
5. Additional commissioning checks
Beyond standard SPD acceptance, PV projects should add:
- [ ] Continuity test record for module frame equipotential bonding
- [ ] Dedicated down-conductors for modules projecting beyond the interception zone
- [ ] DC SPD fitted with a DC-specific fuse, correctly coordinated with the SPD
- [ ] DC SPD Uc covers the maximum Voc at low temperature, including the correction factor
- [ ] Waterproofing intact at all roof penetrations (down-conductors, SPD cables, combiners)
- [ ] Mounting connections torqued with anti-loosening measures
- [ ] Inverter AC-side SPD within 1 m
Extension
PV is the canonical example of the "DC overvoltage" problem. The same issues appear in energy storage systems with DC busbars and battery racks: → Energy storage and DC bus protection