GB/T 18802 and CQC Certification (China)
The GB/T 18802 family (.11-2020 power / .12 application / .21 telecom) and the CQC11-462111-2021 certification rules, unit division and filing essentials.
1. The GB/T 18802 family
GB/T 18802 is MOD of IEC 61643 and is the Chinese national product standard for low-voltage SPDs:
| Part | Corresponding IEC | Scope |
|---|---|---|
| GB/T 18802.11-2020 | IEC 61643-11:2011 | Power-system SPD performance & tests (current) |
| GB/T 18802.12-2014 | IEC 61643-12 | Selection & application guide for LV distribution |
| GB/T 18802.21-2016 | IEC 61643-21 | Telecom & signalling network SPD performance & tests |
| PV / DC dedicated parts | IEC 61643-31/-32 etc. | SPDs for PV, DC systems |
Adoption lag
National .11-2020 corresponds to IEC 61643-11:2011; IEC published the 2025 edition (-01/-11 split) which China has not yet adopted. For global platforms, evaluate per target market.
2. CQC certification
Domestic SPDs mostly use CQC voluntary certification (China Quality Certification Centre). The current rule for power SPDs:
- Rule No.: CQC11-462111-2021 (replacing CQC11-462111-2016)
- Product category: 123005
- Certification mode: type test + initial factory inspection + post-certification surveillance
- Certificate validity: 10 years (with a review requirement)
- Base standards: GB/T 18802.11-2020 (power), GB/T 18802.21-2016 (telecom; YD/T 1235.2, YD/T 1542 also referenced)
3. Filing essentials
- Unit division: different applicants / manufacturers / producers, or different constructions / key components, usually form different certification units; variants within a unit need a difference statement.
- Key components: MOV wafers, thermal disconnectors, enclosures are managed as key parts — changes must be declared.
- Factory inspection: initial inspection + surveillance sampling (per Rule Table 7 items and quantities).
- Edition transition: after a new standard/rule is released there is a transition window; failure to convert in time leads to suspension and eventual revocation.
Certification ≠ selection
CQC certification proves the product meets the GB/T 18802 safety/performance baseline, but does not replace engineering selection. Uc, Up, In, Iimp for a specific project still need judgement against site conditions and the current standard.
4. Further reading
- Standards Landscape — the four-family relationship
- IEC 61643 family
- UL 1449
- Updates & Corrigenda
1. The GB/T 18802 family
GB/T 18802 is MOD of IEC 61643 and is the Chinese national product standard for low-voltage SPDs:
| Part | Corresponding IEC | Scope |
|---|---|---|
| GB/T 18802.11-2020 | IEC 61643-11:2011 | Power-system SPD performance & tests (current) |
| GB/T 18802.12-2014 | IEC 61643-12 | Selection & application guide for LV distribution |
| GB/T 18802.21-2016 | IEC 61643-21 | Telecom & signalling network SPD performance & tests |
| PV / DC dedicated parts | IEC 61643-31/-32 etc. | SPDs for PV, DC systems |
Adoption lag
National .11-2020 corresponds to IEC 61643-11:2011; IEC published the 2025 edition (-01/-11 split) which China has not yet adopted. For global platforms, evaluate per target market.
2. CQC certification
Domestic SPDs mostly use CQC voluntary certification (China Quality Certification Centre). The current rule for power SPDs:
- Rule No.: CQC11-462111-2021 (replacing CQC11-462111-2016)
- Product category: 123005
- Certification mode: type test + initial factory inspection + post-certification surveillance
- Certificate validity: 10 years (with a review requirement)
- Base standards: GB/T 18802.11-2020 (power), GB/T 18802.21-2016 (telecom; YD/T 1235.2, YD/T 1542 also referenced)
3. Filing essentials
- Unit division: different applicants / manufacturers / producers, or different constructions / key components, usually form different certification units; variants within a unit need a difference statement.
- Key components: MOV wafers, thermal disconnectors, enclosures are managed as key parts — changes must be declared.
- Factory inspection: initial inspection + surveillance sampling (per Rule Table 7 items and quantities).
- Edition transition: after a new standard/rule is released there is a transition window; failure to convert in time leads to suspension and eventual revocation.
Certification ≠ selection
CQC certification proves the product meets the GB/T 18802 safety/performance baseline, but does not replace engineering selection. Uc, Up, In, Iimp for a specific project still need judgement against site conditions and the current standard.
4. Further reading
- Standards Landscape — the four-family relationship
- IEC 61643 family
- UL 1449
- Updates & Corrigenda